New tile floor and bathroom fixtures, what to do you start with first?

apreston0
hace 7 años

Hi,

I would like to replace the old tile floor, old sink, old light fixture and old tub and shower unit with new items. My question is, do you replace the tile floor last?

Comentarios (3)

  • acm
    hace 7 años

    In terms of actual laying it, you usually do the tub and then the tile and then the vanity, etc., on the finished floor.

    In terms of picking, start with the vanity, then tile, or maybe the two in tandem.

    apreston0 agradeció a acm
  • PRO
    Tile Plus, Inc.
    hace 7 años

    Hi apreston0,

    Here is the order you should take in remodeling your bathroom:

    1. Demo out the tub/shower unit.

    2. Demo out the sink and floor.

    3. Remove the fixture.

    4. Install a new tub/shower unit.

    5. Install a new floor.

    6. Install a new vanity.

    7. Install a new countertop, sink and backsplash.

    8. Install a new fixture.

    In summary, no you do not do the floor tile last. More like the middle.

    Regards,

    Tile Plus, Inc.

    apreston0 agradeció a Tile Plus, Inc.
  • apreston0
    Autor original
    hace 7 años

    Thank you very much....I'd like to be able to use the bathroom while having the repairs done if at all possible.

España
Personalizar mi experiencia con el uso de cookies

Houzz utiliza cookies y tecnologías similares para personalizar mi experiencia, ofrecerme contenido relevante y mejorar los productos y servicios de Houzz. Al hacer clic en 'Aceptar' confirmo que estoy de acuerdo con lo antes expuesto, como se describe con más detalle en la Política de cookies de Houzz. Puedo rechazar las cookies no esenciales haciendo clic en 'Gestionar preferencias'.