Bathroom Remodel - After
1970's home gutting the bathroom down to the studs. Everything was replaced in the bathroom, electrical, plumbing, drywall, flooring, etc. Everything was touched, removed all old fixtures, redid floor, wall, fan, pot lights, moved GFI, waterproofed, tiled, installed shower, toilet, vanity, plumbing, linen closet. Entire project took 10 days.
half wall shower in the space that looks like our setup